Diagnosis procedure
1.Check connector
Is the inspection result normal? Yes >> go to 2.
No >> repair the terminal and connector.
2.Check harness for open circuit

Is the measurement value within the specification? Yes >> go to 3.
No >> repair the combination meter branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the combination meter. Refer to mwi-52, "combination meter : diagnosis procedure".
Is the inspection result normal? Yes (present error)>>replace the combination meter. Refer to mwi-77, "removal and installation".
Yes (past error)>>error was detected in the combination meter branch line.
No >> repair the power supply and the ground circuit.
Eps branch line circuit
Strg branch line circuitBasic inspection
Diagnosis and repair work flow
Work flow
OVERALL SEQUENCE
DETAILED FLOW
1.INTERVIEW FOR MALFUNCTION
Find out what the customer's concerns are.
>> GO TO 2
2.SYMPTOM CHECK
Verify the symptom from the customer's information.
>> GO TO 3
3.BASIC INSPECTION
Check the operation ...
Periodic maintenance
ENGINE COOLANT
System Inspection
WARNING:
Do not remove the radiator cap when the engine is hot. Serious
burns could occur from high pressure
engine coolant escaping from the radiator.
Wrap a thick cloth around the cap. Slowly push down and turn it
a quarter turn to allow built-up pr ...
Basic inspection
Diagnosis and repair work flow
Work flow
Overall sequence
Detailed flow
1.Get information for symptom
Get detailed information from the customer about the symptom (the
condition and the environment when
the incident/malfunction occurs).
Check operation condition of the component o ...