Diagnosis procedure
1.Check connector
Is the inspection result normal? YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.Check harness for open circuit

Is the measurement value within the specification? Yes >> go to 3.
No >> repair the eps control unit branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the eps control unit. Refer to stc-22, "diagnosis procedure".
Is the inspection result normal? Yes (present error)>>replace the eps control unit. Refer to stc-39, "removal and installation".
Yes (past error)>>error was detected in the eps control unit branch line.
No >> repair the power supply and the ground circuit.
Dlc branch line circuit
M&A branch line circuitRemoval and installation
Horn
Exploded view
Horn high
Horn low
Front
Note:
Shown with the front fascia removed for clarity.
Removal and installation
Horn low
Removal
Remove the core support cover. Refer to ext-23, "removal and
installation".
Disconnect the horn low harness connectors. ...
Basic inspection
Inspection and adjustment
Additional service when replacing control unit (bcm)
Additional service when replacing control unit (bcm) : description
Before replacement
When replacing BCM, save or print current vehicle specification with CONSULT
configuration before replacement.
Note:
If “ ...
Does not stop fully-open or fullyclosed
position
Diagnosis procedure
1. Perform initialization procedure
Perform initialization procedure.
Refer to RF-18, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair
Requirement".
Is the inspection result normal?
YES >> Inspection End.
NO >> Perform basic ins ...