Diagnosis procedure
1.Check connector
Is the inspection result normal? Yes >> go to 2.
No >> repair the terminal and connector.
2.Check harness for open circuit

Is the measurement value within the specification? Yes >> go to 3.
No >> repair the eps control unit branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the eps control unit. Refer to stc-22, "diagnosis procedure".
Is the inspection result normal? Yes (present error)>>replace the eps control unit. Refer to stc-39, "removal and installation".
Yes (past error)>>error was detected in the eps control unit branch line.
No >> repair the power supply and the ground circuit.
Dlc branch line circuit
M&a branch line circuitMultiport Fuel Injection System or Engine Control System
Before connecting or disconnecting any harness connector for the
multiport fuel injection system or ECM:
Turn ignition switch to “OFF” position.
Disconnect negative battery terminal.
Otherwise, there may be damage to ECM.
Before disconnecting pressurized fuel line from ...
P0740 Torque converter
DTC Logic
DTC DETECTION LOGIC
DTC
CONSULT screen terms
(Trouble diagnosis content)
DTC detection condition
Possible causes
P0740
TORQUE CONVERTER
(Torque Converter Clutch Circuit/
Open)
The TCM torque converter clutch solenoid
valve current monitor readi ...
Wiring diagram
Intelligent key system/engine start function
Wiring diagram
Nissan vehicle immobilizer systemnats
Wiring Diagram
Vehicle security system
Wiring diagram
...