Diagnosis Procedure
1.Check connector
Is the inspection result normal? Yes >> go to 2.
No >> repair the terminal and connector.
2.Check harness for open circuit

Is the measurement value within the specification? Yes >> go to 3.
No >> repair the eps control unit branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the EPS control unit. Refer to STC-22, "Diagnosis Procedure".
Is the inspection result normal? YES (Present error)>>Replace the EPS control unit. Refer to STC-39, "Removal and Installation".
YES (Past error)>>Error was detected in the EPS control unit branch line.
NO >> Repair the power supply and the ground circuit.
Dlc branch line circuit
M&A branch line circuitID registration procedure
Description
This procedure must be performed after replacing wheels, transmitters or the
BCM, or rotating wheels.
Work Procedure
TPMS ID registration can be performed using one of the following procedures:
Transmitter Activation tool (J-45295-A) with CONSULT (preferred method)
Signal Tec ...
Steering switch (meter control switch) signal circuit
Diagnosis Procedure
Regarding wiring diagram information, refer to mwi-28, "wiring diagram".
1.Check combination meter input signal
Turn ignition switch on.
Measure voltage between the following terminals of the combination
meter.
Is the inspection result normal?
Yes &g ...
Doors
When the doors are locked using one of the
following methods, the doors cannot be opened
using the inside or outside door handles. The
doors must be unlocked to open the doors.
WARNING
Always have the doors locked while
driving. Along with the use of seat belts,
this provides ...